Description: A fully refurbished Spud Lift Cylinder weighing in at a hefty 15 tons without the frame, ready to undertake mineral sands dredging. Worked on in the fitting and machining shops, where a friction test was carried out as the cylinder is single acting.
Contract Period: 9 months.
Client: Tronox Inc.